Design and Implementation of the Amphitheater Hall at Madar Store in Qazvin

Qazvin
photo_5985702655956815162_y

The design and implementation of the amphitheater hall at Madar Store in Qazvin was carried out by Rezco Industrial Group and became operational in 2020. The project services included hall design, acoustic and interior décor implementation, chair production and installation, furniture and equipment supply, and the implementation of electronic systems and auxiliary equipment.

In this hall, 107 R-1600 amphitheater chairs were produced, supplied, and installed according to the spatial design. The interior architecture, acoustics, and equipment were implemented in coordination with one another to prepare the hall for conferences, meetings, and cultural events.

Madar Store Qazvin Amphitheater Project Specifications

Specification Details
Project name Madar Store Qazvin Amphitheater Hall
Location Qazvin, Iran
Implementation and opening year 2020
Project type Design and implementation
Use Conferences, meetings, and cultural events
Rezco services Hall design, acoustic implementation, interior décor, chair production and installation, furniture and equipment supply, electronic systems, and auxiliary equipment
Chair model R-1600
Number of installed chairs 107 units
Acoustic finishes Wall- and ceiling-mounted sound-absorbing panels
Project status Implemented and operational

Hall Design, Implementation, and Equipment Services

Rezco handled the hall design, production, supply, implementation, and installation of equipment as an integrated process. In addition to the chairs, the scope of work included acoustics, interior décor, furniture, electronic systems, and auxiliary equipment.

Project section Completed activities
Hall design Designing the amphitheater space according to the complex’s intended use
Acoustics Designing and implementing sound-absorbing panels on the walls and ceiling
Chairs Producing, supplying, and installing 107 R-1600 amphitheater chairs
Interior décor Implementing the décor in coordination with the other hall elements
Furniture and equipment Supplying the required furniture and equipment
Electronic systems Implementing the hall’s electronic systems and auxiliary equipment

This project is part of Rezco’s work in the design of conference and amphitheater halls.

Acoustic Design and Implementation for Walls and Ceiling

In the Madar Store Qazvin amphitheater, sound-absorbing panels were designed and installed on the walls and ceiling. The goal was to control unwanted reflections and improve speech clarity during meetings and hall programs.

Alongside their acoustic function, the acoustic finishes also form part of the hall’s interior architectural composition. For this reason, they were implemented in coordination with the décor and final appearance of the space.

Chairs and Coordination with the Interior Décor

In this project, 107 R-1600 chairs were produced, supplied, and installed. The selection and installation of the chairs were carried out within the hall design framework so that the seating area would coordinate with the overall spatial organization.

Interior décor implementation was also included in Rezco’s service scope. The relationship between the chairs, wall and ceiling finishes, and other interior elements was considered in shaping the hall’s final composition.

Furniture Supply and Electronic Systems Implementation

The project equipment package also included supplying the required furniture and hall equipment. Implementing electronic systems and auxiliary equipment alongside the interior architectural work and chair installation formed another part of Rezco’s activities.

These services were carried out according to the hall’s use for conferences, meetings, and cultural events.

Amphitheater Design and Implementation Project in Qazvin

The Madar Store Qazvin amphitheater is an example of Rezco’s integrated services in hall design, acoustic implementation, interior décor, and equipment. The project became operational in 2020, and its specifications reflect the company’s scope of work in this project.

Leave a Reply